Exposición de la caja del cliente

Unidad de perforación y rejuntamiento montada en vía para reparación de emergencia de los trazados de carreteras

The roadbed of the Shandong section of the expressway has collapsed and subsided. It is urgent to restore the road! At our company’s site of the crawler-mounted grouting reinforcement drilling machine, the drilling and grouting unit does not require complex site layout. Once on site, it can be quickly set up. The drill bit penetrates […]

Máquina de perforación de rejuntamiento montada en orugas diésel y pequeña excavadora, lista para partir hacia Guangzhou

Introduction to ZLJ Track Injection Drilling Machine: The ZLJ-1300 model and ZLJ-1200 model diesel-powered track-mounted injection drilling machine, as well as the electrically-powered track-mounted injection drilling machine, are all generations of track-mounted walking injection drilling machines developed by our company in response to the problem of inconvenient movement encountered during the injection process. It is […]

La plataforma de perforación tipo oruga para la mina de carbón de Shaanxi ha sido empaquetada y despachada.

On September 8, 2021, we received a call from a customer in Shaanxi Province who was looking for a crawler-type tunnel drilling rig for use in coal mines. Considering the actual situation in Shaanxi where the pressure relief treatment of tunnels and the gas drainage treatment are difficult and the efficiency of gas drainage treatment […]

Habitación 01-705, 7ª planta, Edificio Comercial Zona C, Plaza Galáctica de Tianshan, Yuhua East Road, Zona de Alta Tecnología Ciudad de Shijiazhuang, provincia de Hebei, China

+8613613213963

Llámanos

export@yunyicanghb.com

Soporte online 24/7

Copyright © 2026 Yunyi Cang (Hebei) Supply Chain Management Co., Ltd. Todos los derechos reservados.

Contáctenos

Consulta de Solicitud